Platform

Coordination software built for preconstruction

Not markup software. Not project management. Current Sets is a coordination platform with tools that actually help with day-to-day tasks-revision comparison, plan reviews, cross-discipline overlays - all in one place.

Built for coordination. Not just collaboration.

Most tools were built to manage documents. Current Sets was built to manage coordination.

Design coordination has long relied on a patchwork of tools and disconnected workflows. Current Sets unifies that process - centralizing drawings, reviews, and reports into one connected platform.

The result is a shift from reactive to proactive, where every discipline stays aligned before construction begins.

Cross Discipline Overlay

No other platform can take a set of PDFs and generate a complete 2D overlay model. We build coordination views across every building, floor, and discipline - unit types, large-scale plans, all of it. What used to take days/weeks in Bluebeam now takes a couple hours.

  • Manual/Automated overlayed generation from PDFs

  • Catch clashes between discipline

  • Verify coordination across the entire set

Revision Comparison

Compare any two versions of a drawing set - permit to IFC, Rev A to Rev B. Our overlay shows exactly what changed: old information in blue, new information in red, unchanged in white. Use the tool yourself or let us run the deep analysis.

  • Visual overlay with color-coded changes

  • Blue (old), red (new), white (unchanged)

  • Self-serve or expert-led analysis

Issue Tracking

Every coordination issue gets logged, assigned, and tracked to resolution. Filter by discipline, status, or severity. Export to your project management tools or share a live tracker link with the design team.

  • Discipline-tagged issues
  • Assignment and status workflow
  • Shareable tracker links
ARC-042 Door swing conflicts with adjacent casework OPEN STR-018 Beam depth exceeds ceiling plenum at Grid D CRITICAL MEC-091 VAV box location updated per RFI response CLOSED 14 Open 3 Critical 47 Resolved

Milestone Management

Organize every drawing set by milestone - SD, DD, 50% CD, 90% CD, 100% CD. Track completeness, compare across phases, and maintain a single source of truth from schematic design through permit.

  • Phase-organized drawing sets
  • Completeness tracking by index
  • Cross-milestone comparison
SD Complete DD Complete 90% In Review 100% Pending 90% CD Set 847 sheets • 14 disciplines 98% Complete